Kyle Harrison
spec

Google Fiber City Checklist (February 2014)

Google Fiber February 2014 View original ↗

TL;DR — What Google Fiber asked 34 US cities to prepare before it would build: pole access, conduit maps, permitting timelines.

A 29-page checklist Google Fiber sent to the 34 cities it was evaluating in 2014. It collects best practices from the Fiber to the Home Council, the Gig.U report and the U.S. Conference of Mayors, and asks cities for infrastructure maps, access to poles and conduit, and streamlined permits.

What it is: an operational document, and a concrete list of what makes city infrastructure fast or slow to build. This copy is from the Wayback Machine.

Where this came from

29 pages. A copy is archived locally against link rot; the header links the original source.